• Where have we been?
  • About Charmary
    • History
    • Technical data
    • Rig data
    • The Starlight 39
  • Logs
    • Log – 2022
      • Detailed log – 2022
    • Log -2019
      • Detailed log – 2019
      • 2019 photo log
    • Log – 2018
      • Detailed log – 2018
      • 2018 photo log
    • Log – 2017
      • Detailed log – 2017
      • 2017 photo log
    • Log – 2016
      • Detailed log – 2016
      • 2016 photo log
    • Log – 2015
      • Detailed log – 2015
      • Summary/sailing log 2015
    • Log – 2014
      • Detailed log – 2014
      • Summary/sailing log 2014
    • Log – 2013
      • Detailed log – 2013
      • Summary/sailing log 2013
    • Log – 2012
      • Detailed log – 2012
      • Summary/sailing log 2012
    • Log – 2011
    • Log – 2010
  • Picture galleries
    • By tag …
    • 2010
    • 2011
    • 2012
    • 2013
    • 2014
    • 2015
    • 2016
  • Videos
  • Search
Charmary
Sadler Starlight 39 - Reg. No. 720142
Skip to content
  • Where have we been?
  • About Charmary
    • History
    • Technical data
    • Rig data
    • The Starlight 39
  • Logs
    • Log – 2022
      • Detailed log – 2022
    • Log -2019
      • Detailed log – 2019
      • 2019 photo log
    • Log – 2018
      • Detailed log – 2018
      • 2018 photo log
    • Log – 2017
      • Detailed log – 2017
      • 2017 photo log
    • Log – 2016
      • Detailed log – 2016
      • 2016 photo log
    • Log – 2015
      • Detailed log – 2015
      • Summary/sailing log 2015
    • Log – 2014
      • Detailed log – 2014
      • Summary/sailing log 2014
    • Log – 2013
      • Detailed log – 2013
      • Summary/sailing log 2013
    • Log – 2012
      • Detailed log – 2012
      • Summary/sailing log 2012
    • Log – 2011
    • Log – 2010
  • Picture galleries
    • By tag …
    • 2010
    • 2011
    • 2012
    • 2013
    • 2014
    • 2015
    • 2016
  • Videos
  • Search
Tag: queenborough
Home Posts tagged "queenborough"

Tag: queenborough

Meandering to the Medway

Summary: Limehouse Basin to Queenborough. Left 13:30 and arrived at Queenborough 19:30. 41.3 miles. Wind mostly NW around 4 or 5 occasionally gusting 6. We left Limehouse around 1.30pm after the engineer had fixed the ignition switch. Had a nice run down the Thames and hoisted full sail shortly after …

andy_beharrell May 21, 2012 February 20, 2017 2012 / Round Britain 2012
Continue reading"Meandering to the Medway"
©2018 Charmary
Powered by Septera & WordPress.
Back to Top